A / Payroll against workload
Illustrative / one year
- In-house payroll
- Workload, and your cost with Vertex
- Salary paid with no work to cover
Fig. 01 / Typical building / MEP model
Local grid / 1 : 400
01/ 04Per project
(01) Vertex / Design by Project
On-demand MEP engineering design for engineering offices, consultants and contractors in Saudi Arabia. You pay for the project, not for fixed salaries.
Scene 01 of 04, Per project. Pay per project. Not per payroll.
Fig. 01 / The idea / Cost follows workload
Read slowly / 39 words
A payroll is a flat line. Projects arrive as a wave. Vertex lets your design cost follow the wave: we draw the fire, air, power and water for the project in hand, and you pay for that project only.
Fig. 02 / Disciplines / MEP design
Four disciplines / one coordinated set
01Electrical/ Power and lighting
Power, lighting and distribution layouts,coordinated with the mechanical services.
02HVAC/ Cooling and ventilation
Cooling and ventilation drawings for your project,to the codes you work to.
03Fire and safety/ Firefighting and alarm
Sprinklers, hose and standpipe networksand fire alarm layouts for your project.
04Plumbing and drainage/ Water supply and drainage
Water supply, drainage and vent layouts,drawn on the same base plans as the rest.
Fig. 03 / Cost / Payroll against workload
Illustrative, not measured data
With an in-house team the cost stays the same in quiet months. With Vertex the design cost rises and falls with the projects you win.
A / Payroll against workload
Illustrative / one year
B / In-house team
Fixed cost
C / Vertex
Cost per project
D / Codes
The codes we design to
Fig. 04 / Process / Brief to sheets
Hover a step for its model
Fig. 10 / Atlas / Where the models live
3 offices / 10 buildings / dashed lines lead from each office
Stockholm leads the work around the Baltic and the North Atlantic, Lisbon the Atlantic coast and New York the projects across the USA. Switch between Europe and the USA, or select a marker to fly to it and read its facts.
Open the full atlasFig. 11 / Field reports / Notes from site
Written by the partners who took the readings
Fig. 12 / Engage / Start a commission
Replies within two working days